Tomorrow we will rebuild the master bathroom exterior wall (done on the 29th). At some point the header in the kitchen will be put in and Dana will have a helper working there on random odds and ends projects… We will update when there is a better plan.
Sunday 1/27
January 28, 2008We started tackling this project yesterday. Obviously, this old wall isnt supporting the roof at all. The floor joists are in and now square (it was 3 inches out of square on the floor). Tomorrow we push this wall down and build a proper one. 
Below is a picture of the outside of this wall. As I said it was 3 inches out of square, so the left side of this wall in this photo needs to come out 3 inches to be square with the right side. So we will just have to trim out those 3 inches when re-siding. That seems to make more sense then a crooked wall to hide the mistake. 
Posted by campbellhill