2/25 – 3/2
February 29, 2008This weeks goals….finish wiring the back area. Put up sheetrock and start finishing the walls everywhere besides the bathrooms. …..the back area was wired and dana and I put up what sheetrock we had… about nine 12′ sheets.
Dana put up all the light boxes, fan and chandelier braces. 2/29/08
2/18 – 2/24
February 27, 2008Not a crazy productive week. Purchased a lot of supplies (trim, plaster, electrical), I did a ton of research on plaster to fix the old walls and actually did one wall suprisingly well. Jimmy and his brother came out Saturday and got our kitchen raised and new support onto the new poured footings. Also, finished framing the master bathroom ceiling and framed out the window. We’ve got to pick out a window and put it in this week. Pictures and more updates coming later today…
Things to purchase
February 13, 2008Heart Pine wood floors for entry, kitchen and back entry. Need about 300 sq. ft. It will match the Heart Pine in the living and dining rooms.
Crown molding. 6.5″ for the 10′ ceiling and a smaller 5.25″ for the 8′. (Purchased 2/18/08)
Wire, switch and outlet boxes. (Purchased 2/25/08) may need some more odds and ends
Sheetrock. (Purchased 2/29/08 only had) we now need about 10 more 12′ sheets
Windows for bedroom and bathroom. (Purchased 2/26/08)
Trim for doors, base and windows
Tongue and groove for old addition ceilings


Posted by campbellhill
Posted by campbellhill 

Posted by campbellhill